Overview
Open intelligence across connected systems, worst first. Nightly run completed 03:10.
Class-wide DG cooling water blockage pattern
criticalFour corrective work orders across CV-02 and CV-05 share the COOL-BLOCK signature: marine growth fouling seawater intakes, escalating from alarms to protective shutdowns and a damaged impeller ($14.6k). Consistent with a class-wide intake design susceptibility in tropical waters. ECR-2025-018 raised; four vessels unassessed.
CV-05 health deteriorating three weeks running
warningCorrective-to-preventive ratio rising and two PMs overdue. Trend driver is the seawater system group. Recommend bringing the intake inspection forward.
Docking-window milestone slipping on the Fleet Docking Program
warningThe CV-03 intake assessment milestone is forecast 22 days past baseline on the monday.com Fleet Docking Program board. It gates ECR-2025-018 work in CV-03's September docking window; at current slip the window is missed.
Steering HPU spare seal kits below reorder point
warningTwo kits on hand, 11-week lead time, and WO-25-0501 is likely to consume one. A second HPU event before November would mean a stockout on a criticality-5 system.
Corrective work orders per quarter
CV-02 diverged from the fleet average four quarters before the impeller failure.
Cost per COOL-BLOCK event
The pattern got expensive at event three. Early detection pays for the year.
Ask Longsplice
Plain-language questions over every connected system. Answers cite their sources; no citation, no claim.
Assets
Coral-class fleet, scored nightly from failure trend, corrective ratio, overdue PMs and defect recurrence.
| Code | Vessel | Health | 12-month trend | State |
|---|
Engineering changes
Every change with its blast radius: affected assets, drawings and procedures traced through the knowledge graph.
ECR-2025-018 ยท Seawater intake grate redesign and antifoul upgrade
in assessment ยท day 38Raised by L. Tran off the class-wide DG cooling blockage pattern. Risk rating medium. Docking windows for CV-03 and CV-06 close in September; assessment must complete by 15 August to make them.
Daily briefing
Composed each morning from the last 24 hours of insights, changes and risks. Delivered in-app and by email.
Meridian Marine Services ยท Sunday 19 July 2026
Needs a decision. ECR-2025-018 (intake grate redesign) has been in assessment 38 days. Four vessels remain exposed to the cooling blockage pattern that damaged CV-02's DG1 impeller ($14.6k). Docking windows for CV-03 and CV-06 close in September; the assessment needs an owner and a date.
Watch. CV-02 steering HPU pressure fluctuation (WO-25-0501) is still open at priority 1, nine days in progress, and spare seal kits are below reorder point with an 11-week lead. CV-05 health trend remains deteriorating for a third week.
Good news. CV-04 preventive completion is at 96% for the quarter and its health score is up 4.1 points since April. Fleet PM compliance is the best it has been this year.